Construction Progress at Eagle's Wings
Aerial view of the main campus with the master plan layout super imposed - Picture taken during construction at the end of August 2007
February 17, 2007 the Board of Directors broke ground for the Main Campus at Eagle's Wings
Bruce Matous rolled in the heavy equipment to start on the Waste Water Treatment Plant
The waste water plant was completed with a 4 staged tank the size of most houses
The water and waste water lines were then installed
Surveying occurred for the pipes, the roads, the building sites and the Manholes (Yes we have 8 manholes around the campus, it looks like a city going in)
Then the culverts were installed prior to the road being started
The big culverts had to have extra side wings installed because of the water flow
The underground electrical conduit was installed and the transformer was placed - we have Power - PEC brought power to the transformer in October 2007 The Roads have been graded and the road base installed - ready for the roller
View from the campus looking towards the highway and then back into the campus
The loop through the dormitory area View from the Clergy cabin into campus
It's pretty cool to see water lines, waste waters lines, manholes, electrical conduit and roads taking shape - this view is looking towards the Chapel, Dining Hall and Meeting Hall below is the meadow before we started
A lot of prayer, hard work and generous donations have gone into this dream - Keep it Alive!!!
|
|